本頁只刊出中文翻譯與中文說明;英文原文請見下方原文連結。
原文連結
論文資訊
- 類型:已發表論文
- 日期:2001
摘要
A method for assigning tasks or resources, based on a model of division of labor in 社會 insects, is introduced and applied to a dynamic flow shop scheduling problem. The problem consists of assigning trucks to paint booths in a truck facility to minimize total makespan and the number of paint flushes. Similarities between the ant-based approach and a market-based approach are highlighted. Both systems are able to adapt well to changing conditions.
※ 此為已發表論文,全文需透過期刊付費取得